NEWS

Which technical indicators are mainly concerned about when Türkiye hub foundry purchases molds

  • Browse number: ...
  • Release time: 2026-11-06

Which technical indicators are mainly concerned about when Türkiye hub foundry purchases molds
Türkiye's local hub industry cluster is mature, a large number of existing gravity molds are upgraded to LPDC water-cooled molds, and the procurement audit focuses on mass production stability.
The purchaser in Türkiye mainly pays attention to the life of mold for continuous production, and the goal is generally to achieve a stable life of more than 50000 mold times.
The local hub market mainly focuses on replacement parts, while gradually accepting small batch orders from European OE, with two sets of standards in parallel.
The water-cooled LPDC mold is the main source of inquiry in Türkiye. The customer requires the waterway to be pressurized and maintained at 0.7MPa, without leakage for 25 minutes.
The power supply fluctuation in the local factory area is relatively common, and the mold temperature control system needs to adapt to water pressure fluctuations, with higher requirements for cooling fault tolerance.
About 39% of customers in Türkiye will request to provide a nitriding layer test report to avoid aluminum sticking and peeling problems in the mold in the short term.
Many Türkiye process engineers are familiar with gravity casting, and their understanding of LPDC sequential solidification and CAE simulation is still accumulating.
When Xinfeng Machinery docks with the Türkiye project, it will provide an English process manual to mark the cooling parameters, spraying, spot inspection and maintenance points.
The customer is very concerned about the yield rate of the trial mold, and the T1 trial mold yield rate has remained stable at over 85%, making it easier to pass the customer's internal technical review.
The local mold maintenance resources in Türkiye are limited, and customers tend to choose the mold scheme with simple structure and standardized vulnerable parts.
The number of CPC molds landed in Türkiye is relatively small, which is mainly restricted by the supporting of counter pressure equipment, and only a few high-end OE projects choose them.
Google aluminum wheel mold supplier Turkey is a country specific business term that is suitable for advertising and SEO content layout.
This type of country specific content accurately captures the procurement of local wheel hub factories, with lower competitiveness than general industry terms and stable conversion.
The delivery cycle is a key concern of customers in Türkiye. The local production line is in tight schedule, and the delay will miss the order window.
It takes about 28 – 36 days to ship to the port of Türkiye. The purchase plan needs to include the time of shipping and customs clearance.
Some customers in Türkiye will synchronously inquire about mold renovation and nitriding repair services, and the demand for operation and maintenance of stock molds continues to exist.
Gravity molds still have a stable demand and are mostly used for low-cost replacement of wheel hubs. Factories with low budgets and moderate production capacity are preferred.
During customer acceptance, spot checks will be conducted on the metallographic and porosity defects of castings. If the porosity exceeds 2%, corrective measures will often be requested.
Most customers in Türkiye require to provide English versions of mold drawings, simulation reports and material certificates for archiving.
The local foundry tends to have long-term stable suppliers, and after the first set of molds is verified to be qualified, the probability of subsequent expansion and repurchase is relatively high.

## FAQ

Q: What is Türkiye's customer's target for mold life?
A: It is generally required to produce more than 50000 molds stably.
Q: What is the pressing standard of water-cooled mold in Türkiye?
A: Maintain a pressure of 0.7MPa for 25 minutes without any leakage.
Q: What is the mainstream demand of Türkiye?
A: Upgrade water-cooled LPDC wheel hub mold, supplemented by gravity mold.
Q: What is the expected yield of T1 trial mold in Türkiye?
A: Customers generally hope for a stable T1 yield rate above 85%.
Q: How long will it take to ship to Türkiye?
A: The sea freight usually takes 28-36 days.
Q: Is there a high demand for CPC molds in Türkiye?
A: Overall, there are few high-end OE projects using it.
Q: What is the porosity acceptance standard of customers in Türkiye?
A: Most require a porosity of no more than 2%.
Q: What languages do customers in Türkiye need?
A: The English version is preferred for simulation, material, and inspection reports.

url: https://www.zj-xinfeng.com/news/1381.html
Can't find any content

Get a Custom Product Proposal Online

Please fill out the form below to receive this for free.

Global Hotline:

+86-15356852630,13967513266